Boneyard Creek-which drains an urbanized watershed in the cities of Champaign and Urbana, Illinois, including part of the University of Illinois at Urbana-Champaign (UIUC) campus-has historically been prone to flooding. Using the Stormwater Management Model (SWMM), a hydrologic and hydraulic model of Boneyard Creek was developed for the design of the projects making up the first phase of a long-term plan for flood control on Boneyard Creek, and the construction of the projects was completed in…

Using Observed Postconstruction Peak Discharges to Evaluate a Hydrologic and Hydraulic Design Model, Boneyard Creek, Champaign and Urbana, Illinois (el. knyga) (skaityta knyga) | knygos.lt

Atsiliepimai

Aprašymas

Boneyard Creek-which drains an urbanized watershed in the cities of Champaign and Urbana, Illinois, including part of the University of Illinois at Urbana-Champaign (UIUC) campus-has historically been prone to flooding. Using the Stormwater Management Model (SWMM), a hydrologic and hydraulic model of Boneyard Creek was developed for the design of the projects making up the first phase of a long-term plan for flood control on Boneyard Creek, and the construction of the projects was completed in May 2003. The U.S. Geo-logical Survey, in cooperation with the Cities of Champaign and Urbana and UIUC, installed and operated stream and rain gages in order to obtain data for evaluation of the design-model simulations.

Knygos.lt klubas
Knygos.lt nariams
26,00 €
-15%
Įprastai
30,59 €
Kaina registruotiems pirkėjams
Prisijunkite ir už šią prekę
gausite 0,26 Knygų Eurų!?
Išsiųsime per 12–18 d.d.
Įsigykite dovanų kuponą
Daugiau

Boneyard Creek-which drains an urbanized watershed in the cities of Champaign and Urbana, Illinois, including part of the University of Illinois at Urbana-Champaign (UIUC) campus-has historically been prone to flooding. Using the Stormwater Management Model (SWMM), a hydrologic and hydraulic model of Boneyard Creek was developed for the design of the projects making up the first phase of a long-term plan for flood control on Boneyard Creek, and the construction of the projects was completed in May 2003. The U.S. Geo-logical Survey, in cooperation with the Cities of Champaign and Urbana and UIUC, installed and operated stream and rain gages in order to obtain data for evaluation of the design-model simulations.