The U.S. Nuclear Regulatory Commission (NRC) has been considering revision of the regulatory requirements for the emergency core cooling system (ECCS), as set forth in Title 10, Section 50.46, of the Code of Federal Regulations (10 CFR 50.46); Appendix K to 10 CFR Part 50; and General Design Criterion (GDC) 35. In particular, those requirements state that the ECCS shall be sized to provide adequate makeup water to compensate for a break of the largest diameter pipe in the primary system [i.e.,…
The U.S. Nuclear Regulatory Commission (NRC) has been considering revision of the regulatory requirements for the emergency core cooling system (ECCS), as set forth in Title 10, Section 50.46, of the Code of Federal Regulations (10 CFR 50.46); Appendix K to 10 CFR Part 50; and General Design Criterion (GDC) 35. In particular, those requirements state that the ECCS shall be sized to provide adequate makeup water to compensate for a break of the largest diameter pipe in the primary system [i.e., the so-called "double-ended guillotine break" (DEGB)]. Consequently, in order to risk-inform the break size, the staff of the NRC proposed the concept of transition break size (TBS). In addition, the NRC developed pipe break frequencies as a function of break size using an expert elicitation process for degradation-related pipe breaks in reactorcoolantsystemsoftypicalboiling-andpressurized-waterreactors. Thatelicitationfocusedon determining event frequencies that initiate by unisolable primary side failures that can be exacerbated by material degradation with age under normal operating conditions. The purpose of this study was to assess potential seismic effects on the postulated TBS, and to provide information to facilitate review and comment regarding the proposed risk-informed revision of ECCS requirements in 10 CFR 50.46. Thus, this report evaluates the seismic effects, using different approaches to evaluate flawed and unflawed piping, and indirect failures of other components and component supports that could lead to piping failure.
Knygos.lt nariams
23,23 €
-30%
Įprastai
33,19 €
Kaina registruotiems pirkėjams
Prisijunkite ir už šią prekę gausite 0,33 Knygų Eurų!?
The U.S. Nuclear Regulatory Commission (NRC) has been considering revision of the regulatory requirements for the emergency core cooling system (ECCS), as set forth in Title 10, Section 50.46, of the Code of Federal Regulations (10 CFR 50.46); Appendix K to 10 CFR Part 50; and General Design Criterion (GDC) 35. In particular, those requirements state that the ECCS shall be sized to provide adequate makeup water to compensate for a break of the largest diameter pipe in the primary system [i.e., the so-called "double-ended guillotine break" (DEGB)]. Consequently, in order to risk-inform the break size, the staff of the NRC proposed the concept of transition break size (TBS). In addition, the NRC developed pipe break frequencies as a function of break size using an expert elicitation process for degradation-related pipe breaks in reactorcoolantsystemsoftypicalboiling-andpressurized-waterreactors. Thatelicitationfocusedon determining event frequencies that initiate by unisolable primary side failures that can be exacerbated by material degradation with age under normal operating conditions. The purpose of this study was to assess potential seismic effects on the postulated TBS, and to provide information to facilitate review and comment regarding the proposed risk-informed revision of ECCS requirements in 10 CFR 50.46. Thus, this report evaluates the seismic effects, using different approaches to evaluate flawed and unflawed piping, and indirect failures of other components and component supports that could lead to piping failure.
Atsiliepimai
Atsiliepimų nėra
0 pirkėjai įvertino šią prekę.
5
0%
4
0%
3
0%
2
0%
1
0%
Kainos garantija
Ženkliuku „Kainos garantija” pažymėtoms prekėms Knygos.lt garantuoja geriausią kainą. Jei identiška prekė kitoje internetinėje parduotuvėje kainuoja mažiau - kompensuojame kainų skirtumą. Kainos lyginamos su knygos.lt nurodytų parduotuvių sąrašu prekių kainomis. Knygos.lt įsipareigoja kompensuoti kainų skirtumą pirkėjui, kuris kreipėsi „Kainos garantijos” taisyklėse nurodytomis sąlygomis. Sužinoti daugiau
Elektroninė knyga
22,39 €
DĖMESIO!
Ši knyga pateikiama ACSM formatu. Jis nėra tinkamas įprastoms skaityklėms, kurios palaiko EPUB ar MOBI formato el. knygas.
Svarbu! Nėra galimybės siųstis el. knygų jungiantis iš Jungtinės Karalystės.
Tai knyga, kurią parduoda privatus žmogus. Kai apmokėsite užsakymą, jį per 7 d. išsiųs knygos pardavėjas . Jei to pardavėjas nepadarys laiku, pinigai jums bus grąžinti automatiškai.
Šios knygos būklė nėra įvertinta knygos.lt ekspertų, todėl visa atsakomybė už nurodytą knygos kokybę priklauso pardavėjui.
Perskaityta knyga:
Nenauja knyga, kuri parduodama tiesiai iš knygos.lt sandėlio. Knygos kokybė įvertinta knygos.lt ekspertų.
Tai knyga, kurią parduoda privatus žmogus. Kai apmokėsite užsakymą, jį per 7 d. išsiųs knygos pardavėjas . Jei to pardavėjas nepadarys laiku, pinigai jums bus grąžinti automatiškai.
Šios knygos būklė nėra įvertinta knygos.lt ekspertų, todėl visa atsakomybė už nurodytą knygos kokybę priklauso pardavėjui.
Atsiliepimai