In November 2002, the Diamond Offshore Drilling, Inc. (hereinafter referred to as "Contractor" or "DODI") jack-up rig Ocean King (hereinafter referred to as the "Rig") was engaged in drilling operations for BP Exploration & Production Inc. on Grand Isle (GI) Block 90 Well C-7 sidetrack (ST). The Rig was in place next to the GI 93 "C" platform (hereinafter referred to as the "Platform"). Drilling operations were being conducted with the Rig cantilevered over the Platform using the re-claimed slo…

Investigation of Loss Control Grand Isle Block 90, Well C-7ST OCS-G 4003 (el. knyga) (skaityta knyga) | knygos.lt

Atsiliepimai

Aprašymas

In November 2002, the Diamond Offshore Drilling, Inc. (hereinafter referred to as "Contractor" or "DODI") jack-up rig Ocean King (hereinafter referred to as the "Rig") was engaged in drilling operations for BP Exploration & Production Inc. on Grand Isle (GI) Block 90 Well C-7 sidetrack (ST). The Rig was in place next to the GI 93 "C" platform (hereinafter referred to as the "Platform"). Drilling operations were being conducted with the Rig cantilevered over the Platform using the re-claimed slot of the C-7 well, which had been plugged and abandoned (P&A'd).

Knygos.lt klubas
Knygos.lt nariams
20,64 €
-30%
Įprastai
29,49 €
Kaina registruotiems pirkėjams
Prisijunkite ir už šią prekę
gausite 0,29 Knygų Eurų!?
Išsiųsime per 12–18 d.d.
Įsigykite dovanų kuponą
Daugiau

In November 2002, the Diamond Offshore Drilling, Inc. (hereinafter referred to as "Contractor" or "DODI") jack-up rig Ocean King (hereinafter referred to as the "Rig") was engaged in drilling operations for BP Exploration & Production Inc. on Grand Isle (GI) Block 90 Well C-7 sidetrack (ST). The Rig was in place next to the GI 93 "C" platform (hereinafter referred to as the "Platform"). Drilling operations were being conducted with the Rig cantilevered over the Platform using the re-claimed slot of the C-7 well, which had been plugged and abandoned (P&A'd).

Atsiliepimai

  • Atsiliepimų nėra
0 pirkėjai įvertino šią prekę.
5
0%
4
0%
3
0%
2
0%
1
0%
(rodomas nebus)
[{"option":"222","probability":1,"style":{"backgroundColor":"#ffffff"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba631ba76d1782294065.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}},{"option":"221","probability":1.3,"style":{"backgroundColor":"#e1032e"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba61ea9f381782294046.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}},{"option":"220","probability":1.6,"style":{"backgroundColor":"#ffffff"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba60167d251782294017.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}},{"option":"219","probability":1.5,"style":{"backgroundColor":"#e2022e"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba5ea1c47d1782293994.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}},{"option":"218","probability":1.5,"style":{"backgroundColor":"#ffffff"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba5d38b4a21782293971.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}},{"option":"217","probability":1.6,"style":{"backgroundColor":"#e3022e"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba5b981b7a1782293945.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}},{"option":"216","probability":1.4,"style":{"backgroundColor":"#ffffff"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba58b535551782293899.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}},{"option":"215","probability":0.1,"style":{"backgroundColor":"#ffe01a"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba53a6496f1782293818.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}}]