Knygos.lt klubas Knygos.lt nariams
83,57 €
-30%
Įprastai
119,39 €
Integrated Scheduling of Continuous Casters and Hot Strip Mills
Integrated Scheduling of Continuous Casters and Hot Strip Mills
Knygos.lt klubas Knygos.lt nariams
83,57 €
-30%
Įprastai
119,39 €
  • Išsiųsime per 12–18 d.d.
Continuous casting and hot strip milling are two successive production steps in the steel industry. In her thesis Imke Mattik develops model formulations to integrate the scheduling of continuous casters and hot strip mills. Aim is to reduce the waiting times of the pre-products, called slabs, between the production steps and at the same time to reduce the energy consumption. Along with two different model formulations extensive numerical tests and comparative analyses are provided.
  • Leidėjas:
  • Metai: 2013
  • Puslapiai: 120
  • ISBN-10: 3658037741
  • ISBN-13: 9783658037741
  • Formatas: 14.8 x 21 x 0.8 cm, minkšti viršeliai
  • Kalba: Anglų

Integrated Scheduling of Continuous Casters and Hot Strip Mills (el. knyga) (skaityta knyga) | knygos.lt

Atsiliepimai

(4.00 Goodreads įvertinimas)

Aprašymas

Continuous casting and hot strip milling are two successive production steps in the steel industry. In her thesis Imke Mattik develops model formulations to integrate the scheduling of continuous casters and hot strip mills. Aim is to reduce the waiting times of the pre-products, called slabs, between the production steps and at the same time to reduce the energy consumption. Along with two different model formulations extensive numerical tests and comparative analyses are provided.

Knygos.lt klubas
Knygos.lt nariams
83,57 €
-30%
Įprastai
119,39 €
Kaina registruotiems pirkėjams
Prisijunkite ir už šią prekę
gausite 1,19 Knygų Eurų!?
Išsiųsime per 12–18 d.d.
Įsigykite dovanų kuponą
Daugiau
  • Autorius: Imke Mattik
  • Leidėjas:
  • Metai: 2013
  • Puslapiai: 120
  • ISBN-10: 3658037741
  • ISBN-13: 9783658037741
  • Formatas: 14.8 x 21 x 0.8 cm, minkšti viršeliai
  • Kalba: Anglų

Continuous casting and hot strip milling are two successive production steps in the steel industry. In her thesis Imke Mattik develops model formulations to integrate the scheduling of continuous casters and hot strip mills. Aim is to reduce the waiting times of the pre-products, called slabs, between the production steps and at the same time to reduce the energy consumption. Along with two different model formulations extensive numerical tests and comparative analyses are provided.

Atsiliepimai

  • Atsiliepimų nėra
0 pirkėjai įvertino šią prekę.
5
0%
4
0%
3
0%
2
0%
1
0%
(rodomas nebus)
× Akcija + knyga už 1ct