Atsiliepimai
Aprašymas
Water-resource managers in Onondaga County, New York, are faced with the challenge of improving the water quality of Onondaga Lake, which has the distinction of being one of the most contaminated lakes in the United States. To assist in this endeavor, during 2003-07 the U.S. Geological Survey (USGS), in cooperation with the Onondaga Lake Partnership, developed a precipitation-runoff model of the 285-square-mile Onondaga Lake Basin with the computer program Hydrological Simulation Program-Fortran (HSPF).
Water-resource managers in Onondaga County, New York, are faced with the challenge of improving the water quality of Onondaga Lake, which has the distinction of being one of the most contaminated lakes in the United States. To assist in this endeavor, during 2003-07 the U.S. Geological Survey (USGS), in cooperation with the Onondaga Lake Partnership, developed a precipitation-runoff model of the 285-square-mile Onondaga Lake Basin with the computer program Hydrological Simulation Program-Fortran (HSPF).
Atsiliepimai