Knygos.lt klubas Knygos.lt nariams
61,52 €
-30%
Įprastai
87,89 €
Flexible AC Transmission System (FACTS) Devices
Flexible AC Transmission System (FACTS) Devices
Knygos.lt klubas Knygos.lt nariams
61,52 €
-30%
Įprastai
87,89 €
  • Išsiųsime per 12–18 d.d.
Since the liberalization of the energy market the situation in the German transmission system has changed significantly. The trade of energy has increased rapidly and subsequently there is much more energy to transmit than at the time the main parts of the transmission system were built, which is nowadays 30 to 50 years ago. Additionally the energy from the growing amount of installed wind power, especially in the northern part of Germany, has to be transmitted to the more densely populated are…
  • Leidėjas:
  • Metai: 2015
  • Puslapiai: 116
  • ISBN-10: 3639853407
  • ISBN-13: 9783639853407
  • Formatas: 15.2 x 22.9 x 0.7 cm, minkšti viršeliai
  • Kalba: Anglų

Flexible AC Transmission System (FACTS) Devices (el. knyga) (skaityta knyga) | knygos.lt

Atsiliepimai

(4.50 Goodreads įvertinimas)

Aprašymas

Since the liberalization of the energy market the situation in the German transmission system has changed significantly. The trade of energy has increased rapidly and subsequently there is much more energy to transmit than at the time the main parts of the transmission system were built, which is nowadays 30 to 50 years ago. Additionally the energy from the growing amount of installed wind power, especially in the northern part of Germany, has to be transmitted to the more densely populated areas. Due to the fact that the system was originally built with the aim of reducing transmission losses, the lines are not suited to transport large amounts of energy. Subsequently the transmission system operators have to rethink the system structure to handle the congestion of the transmission lines. One possibility to control the load flow is either by using FACTS devices or by building additional transmission lines. In this book the costs, possibilities and limits of FACTS are analyzed and stated. Finally, a summary of recommendations is provided, stating in which cases the use of FACTS or the system extension through the construction of new transmission lines is effective and suitable.

Knygos.lt klubas
Knygos.lt nariams
61,52 €
-30%
Įprastai
87,89 €
Kaina registruotiems pirkėjams
Prisijunkite ir už šią prekę
gausite 0,88 Knygų Eurų!?
Išsiųsime per 12–18 d.d.
Įsigykite dovanų kuponą
Daugiau
  • Autorius: Nkusi Ernest
  • Leidėjas:
  • Metai: 2015
  • Puslapiai: 116
  • ISBN-10: 3639853407
  • ISBN-13: 9783639853407
  • Formatas: 15.2 x 22.9 x 0.7 cm, minkšti viršeliai
  • Kalba: Anglų

Since the liberalization of the energy market the situation in the German transmission system has changed significantly. The trade of energy has increased rapidly and subsequently there is much more energy to transmit than at the time the main parts of the transmission system were built, which is nowadays 30 to 50 years ago. Additionally the energy from the growing amount of installed wind power, especially in the northern part of Germany, has to be transmitted to the more densely populated areas. Due to the fact that the system was originally built with the aim of reducing transmission losses, the lines are not suited to transport large amounts of energy. Subsequently the transmission system operators have to rethink the system structure to handle the congestion of the transmission lines. One possibility to control the load flow is either by using FACTS devices or by building additional transmission lines. In this book the costs, possibilities and limits of FACTS are analyzed and stated. Finally, a summary of recommendations is provided, stating in which cases the use of FACTS or the system extension through the construction of new transmission lines is effective and suitable.

Atsiliepimai

  • Atsiliepimų nėra
0 pirkėjai įvertino šią prekę.
5
0%
4
0%
3
0%
2
0%
1
0%
(rodomas nebus)
× Akcija + knyga už 1ct