Knygos.lt klubas Knygos.lt nariams
20,64 €
-30%
Įprastai
29,49 €
Benefit-Cost Evaluation of a Highway-Railroad Intermodal Control System (ICS)
Benefit-Cost Evaluation of a Highway-Railroad Intermodal Control System (ICS)
Knygos.lt klubas Knygos.lt nariams
20,64 €
-30%
Įprastai
29,49 €
  • Išsiųsime per 12–18 d.d.
The Intermodal Control System (ICS) was designed by General Railway Signal Corporation (GRS, now Alstom, Inc.) for highway-rail at-grade crossings, under contract to the New York State Department of Transportation. In partnership with the Long Island Rail Road (LIRR), a site was selected for testing the ICS at the New Hyde Park station, where a grade crossing occurs close to the station. The planned project integrates train control, grade crossing control, and traffic control into a balanced sy…

Benefit-Cost Evaluation of a Highway-Railroad Intermodal Control System (ICS) (el. knyga) (skaityta knyga) | knygos.lt

Atsiliepimai

Aprašymas

The Intermodal Control System (ICS) was designed by General Railway Signal Corporation (GRS, now Alstom, Inc.) for highway-rail at-grade crossings, under contract to the New York State Department of Transportation. In partnership with the Long Island Rail Road (LIRR), a site was selected for testing the ICS at the New Hyde Park station, where a grade crossing occurs close to the station. The planned project integrates train control, grade crossing control, and traffic control into a balanced system that can make decisions affecting both train speed and highway closure.

Knygos.lt klubas
Knygos.lt nariams
20,64 €
-30%
Įprastai
29,49 €
Kaina registruotiems pirkėjams
Prisijunkite ir už šią prekę
gausite 0,29 Knygų Eurų!?
Išsiųsime per 12–18 d.d.
Įsigykite dovanų kuponą
Daugiau

The Intermodal Control System (ICS) was designed by General Railway Signal Corporation (GRS, now Alstom, Inc.) for highway-rail at-grade crossings, under contract to the New York State Department of Transportation. In partnership with the Long Island Rail Road (LIRR), a site was selected for testing the ICS at the New Hyde Park station, where a grade crossing occurs close to the station. The planned project integrates train control, grade crossing control, and traffic control into a balanced system that can make decisions affecting both train speed and highway closure.

Atsiliepimai

  • Atsiliepimų nėra
0 pirkėjai įvertino šią prekę.
5
0%
4
0%
3
0%
2
0%
1
0%
(rodomas nebus)
[{"option":"222","probability":1,"style":{"backgroundColor":"#ffffff"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba631ba76d1782294065.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}},{"option":"221","probability":1.3,"style":{"backgroundColor":"#e1032e"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba61ea9f381782294046.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}},{"option":"220","probability":1.6,"style":{"backgroundColor":"#ffffff"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba60167d251782294017.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}},{"option":"219","probability":1.5,"style":{"backgroundColor":"#e2022e"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba5ea1c47d1782293994.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}},{"option":"218","probability":1.5,"style":{"backgroundColor":"#ffffff"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba5d38b4a21782293971.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}},{"option":"217","probability":1.6,"style":{"backgroundColor":"#e3022e"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba5b981b7a1782293945.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}},{"option":"216","probability":1.4,"style":{"backgroundColor":"#ffffff"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba58b535551782293899.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}},{"option":"215","probability":0.1,"style":{"backgroundColor":"#ffe01a"},"image":{"uri":"\/uploads\/images\/wheel_of_fortune\/6a3ba53a6496f1782293818.png","sizeMultiplier":0.6,"landscape":true,"offsetX":-50}}]