Knygos.lt klubas Knygos.lt nariams
18,96 €
-30%
Įprastai
27,09 €
Afghanistan - Kabul embassy constructions costs have increased and schedules have been extended /
Afghanistan - Kabul embassy constructions costs have increased and schedules have been extended /
Knygos.lt klubas Knygos.lt nariams
18,96 €
-30%
Įprastai
27,09 €
  • Išsiųsime per 12–18 d.d.
" State Awarded Tw Requirements In 2009 and 2010, requirements at the - On Septemb design and structures to center, peri utility buildin 1 was to co within 27 mo - On Septemb design and existing apa parking facili Contractor 2 State's plans called temporary facilities t entailed acquiring a construction of park partially terminated convenience of the delays. Contractor State transferred co Contractor 2's contr February 2014, whe apartment building those buildings). Co of staff into office a hou…

Afghanistan - Kabul embassy constructions costs have increased and schedules have been extended / (el. knyga) (skaityta knyga) | knygos.lt

Atsiliepimai

Aprašymas

" State Awarded Tw Requirements In 2009 and 2010, requirements at the - On Septemb design and structures to center, peri utility buildin 1 was to co within 27 mo - On Septemb design and existing apa parking facili Contractor 2 State's plans called temporary facilities t entailed acquiring a construction of park partially terminated convenience of the delays. Contractor State transferred co Contractor 2's contr February 2014, whe apartment building those buildings). Co of staff into office a housed them. "

Knygos.lt klubas
Knygos.lt nariams
18,96 €
-30%
Įprastai
27,09 €
Kaina registruotiems pirkėjams
Prisijunkite ir už šią prekę
gausite 0,27 Knygų Eurų!?
Išsiųsime per 12–18 d.d.
Įsigykite dovanų kuponą
Daugiau

" State Awarded Tw Requirements In 2009 and 2010, requirements at the - On Septemb design and structures to center, peri utility buildin 1 was to co within 27 mo - On Septemb design and existing apa parking facili Contractor 2 State's plans called temporary facilities t entailed acquiring a construction of park partially terminated convenience of the delays. Contractor State transferred co Contractor 2's contr February 2014, whe apartment building those buildings). Co of staff into office a housed them. "

Atsiliepimai

  • Atsiliepimų nėra
0 pirkėjai įvertino šią prekę.
5
0%
4
0%
3
0%
2
0%
1
0%
(rodomas nebus)