In 1999, a suite of three new conditions of contract was published by FIDIC, following the basic structure and wording harmonised and updated around the previous FIDIC Design-Build and Turnkey Contract (the 1992 Orange Book ). These conditions, known as the FIDIC rainbow, were the Conditions of C- tract for: l Construction, the so-called Red Book, for works designed by the Employer l Plant and Design-Build, the so-called Yellow Book, for works designed by the Contractor l EPC/Turnkey Projects,…
In 1999, a suite of three new conditions of contract was published by FIDIC, following the basic structure and wording harmonised and updated around the previous FIDIC Design-Build and Turnkey Contract (the 1992 Orange Book ). These conditions, known as the FIDIC rainbow, were the Conditions of C- tract for: l Construction, the so-called Red Book, for works designed by the Employer l Plant and Design-Build, the so-called Yellow Book, for works designed by the Contractor l EPC/Turnkey Projects, the so-called Silver Book, for works designed by the Contractor The ?rst is intended for construction works where the Employer is responsible for the design, as for per the previous so-called Red Book 4th Edition (1987), with an important role for the Engineer. The other two conditions of contract are intended for situations when the Contractor is responsible for the design. The Plant and Design-Build Contract has the traditional Engineer while the EPC/Turnkey Contract has a two-party arran- ment, generally with an Employer s Representative as one of the parties."
In 1999, a suite of three new conditions of contract was published by FIDIC, following the basic structure and wording harmonised and updated around the previous FIDIC Design-Build and Turnkey Contract (the 1992 Orange Book ). These conditions, known as the FIDIC rainbow, were the Conditions of C- tract for: l Construction, the so-called Red Book, for works designed by the Employer l Plant and Design-Build, the so-called Yellow Book, for works designed by the Contractor l EPC/Turnkey Projects, the so-called Silver Book, for works designed by the Contractor The ?rst is intended for construction works where the Employer is responsible for the design, as for per the previous so-called Red Book 4th Edition (1987), with an important role for the Engineer. The other two conditions of contract are intended for situations when the Contractor is responsible for the design. The Plant and Design-Build Contract has the traditional Engineer while the EPC/Turnkey Contract has a two-party arran- ment, generally with an Employer s Representative as one of the parties."
Atsiliepimai
Atsiliepimų nėra
0 pirkėjai įvertino šią prekę.
5
0%
4
0%
3
0%
2
0%
1
0%
Kainos garantija
Ženkliuku „Kainos garantija” pažymėtoms prekėms Knygos.lt garantuoja geriausią kainą. Jei identiška prekė kitoje internetinėje parduotuvėje kainuoja mažiau - kompensuojame kainų skirtumą. Kainos lyginamos su knygos.lt nurodytų parduotuvių sąrašu prekių kainomis. Knygos.lt įsipareigoja kompensuoti kainų skirtumą pirkėjui, kuris kreipėsi „Kainos garantijos” taisyklėse nurodytomis sąlygomis. Sužinoti daugiau
Elektroninė knyga
22,39 €
DĖMESIO!
Ši knyga pateikiama ACSM formatu. Jis nėra tinkamas įprastoms skaityklėms, kurios palaiko EPUB ar MOBI formato el. knygas.
Svarbu! Nėra galimybės siųstis el. knygų jungiantis iš Jungtinės Karalystės.
Tai knyga, kurią parduoda privatus žmogus. Kai apmokėsite užsakymą, jį per 7 d. išsiųs knygos pardavėjas . Jei to pardavėjas nepadarys laiku, pinigai jums bus grąžinti automatiškai.
Šios knygos būklė nėra įvertinta knygos.lt ekspertų, todėl visa atsakomybė už nurodytą knygos kokybę priklauso pardavėjui.
Atsiliepimai